What would cut road deaths fastest in the Democratic Republic of the Congo, and how it can be paid for
The DRC loses an estimated 15,000 to 40,000 people a year on its roads, while police record only a fraction (3,364 in 2021 against a WHO estimate of 15,615). Pedestrians are over half of recorded deaths, motorcycle taxis have become the main mode for most users with almost no helmets, licences or insurance, and there is no on-scene emergency care. This study sets out six levers in order of speed and cost: count the dead, protect pedestrians on urban arterials, a helmet-licence-insurance bundle for motorcycle taxis, heavy-vehicle safety on the RN1, lay first responders, and a modernised road code. A core five-year programme costs about US$50-95 million of public money (our planning estimate), roughly 4-8% of FONER's annual resources, with revenue-backed concessions and insurance levies able to carry the rest.
Metro-grids, mining baseload and the Zambia corridor — three proven entries into the world's largest unserved power market
Only 22.5% of DR Congo's 112.8 million people have electricity, yet 2023–2026 produced three bankable templates: MIGA-wrapped urban metro-grids (Nuru), cheaper-than-diesel captive solar-plus-storage for mining (Kamoa-Kakula's $522m complex), and the $300m, 550 MW Kalumbila–Kolwezi import corridor. This feasibility study maps the demand, the capital stacks that actually close, the 2026 reform calendar, and where the next five flagship deals will come from.
Economic and Social Projections
The Democratic Republic of the Congo faces a complex economic landscape marked by a projected GDP of USD 91.0 billion in 2025 and a steady population growth rate of 3.2%. Urbanisation trends indicate an increase in the urban population share to 45.1% by 2025. While the economy shows signs of recovery, challenges remain in skill development and infrastructure. The low-income status continues to shape investment opportunities.
Uganda's power problem has moved from generation to delivery. Installed capacity reached about 2,048 MW in 2024 against a 2025 system peak of about 1,351 MW, but 44.7% of people still lack access, losses run near 17% and manufacturers report frequent outages. The 2030 National Energy Compact targets 85% access, US$17.7 billion of investment (US$9.4 billion private) and 2,712 mini-grids from a base